In-house design. One connected team.

Custom-home costs · Plan the whole property

A clearer scope.
A more useful budget.

The house is one part of your investment. Bring the land, site, utilities, design and outdoor priorities into the same conversation before comparing a headline price.

Original Luxe kitchen and living-room concept
Original Luxe design concept · Features and finishes are subject to your scope.
Know which decisions shape your investment.
Luxe original custom-home concept with a pool and outdoor living
Original design concept · Scope and pricing are developed for your property.

Start with what is included

Every line has
a question behind it.

Two proposals can describe different homes even when they show the same square footage. Confirm the drawings, materials, quantities, site assumptions, allowances and exclusions before comparing totals.

Use the worksheet below to organize figures you already have. It adds your entries; it does not generate construction prices.

Read the proposal-comparison guide

Your planning worksheet

Bring the whole
project into view.

Leave unknown amounts blank. Mark anything counted elsewhere so it is not added twice.

Purchase-related amounts you want to include in your whole-property plan.

Architecture, engineering, surveys and other agreed professional services.

Jurisdiction fees, plan review and any applicable community review.

Grading, excavation, access, retaining and drainage work identified for the lot.

Service availability, required capacity, trenching and connection scope.

The house described by the same plans, specifications and finish assumptions.

Confirm these areas separately from the home’s living-area target.

Landscape, pool, outdoor kitchen, walls and other property improvements.

Include only amounts not already counted in a construction line above.

An amount you choose to set aside for identified unknowns; discuss it with your team.

Entered subtotal

$0

No amounts entered. This is your worksheet subtotal, not a project quote.

Amounts marked “Included in another line” are excluded from the subtotal. All other entered amounts are added. An allowance or blank line can still need further scope review.

Saving keeps these project figures in this browser. Contact details are not part of this worksheet. Nothing is sent to Luxe.

01 / Property

Resolve the lot first.

Buildable area, access, drainage and utility connections can influence the home before a finish is selected.

Start the lot review

02 / Scope

Compare the same work.

Ask what each allowance covers, which quantities it assumes and how changes are documented in your agreement.

Compare proposals thoughtfully

03 / Your priorities

Make room for daily life.

Choose the rooms and relationships that matter to you before dividing an investment across the property.

Organize your home priorities

Make the next conversation useful

Your property.
Your priorities. A clearer plan.

Bring your location, available plans, investment range and the questions still to resolve. Luxe can help connect them to a project-specific design and scope.

Your home. Your dream. Your vision.

Let’s make room
for your next chapter.

Tell us what you have in mind